A rack proposal starts with the intended stock profile.
Cantilever Racking

How to Order Cantilever Racking: A Quote-Ready Checklist

To order cantilever racking, provide a load schedule, a measured layout, the handling method and the site's installation conditions. Those inputs allow the supplier to select the configured system and provide meaningful capacity and pricing information. Ordering from a photograph or rack height alone leaves important decisions unresolved.

Prepare the inventory schedule

For each stored material, record length, depth, height and maximum weight. Include the shortest pieces that must remain supported and describe full bundles, opened bundles and individual picking. Explain whether the inventory profile is expected to change.

Identify the number of required storage positions and any separation between stock families. A clear schedule helps the supplier distinguish a capacity problem from a space-allocation problem. It also becomes a useful operating reference after installation.

Supply the layout and handling information

Show the available footprint, building columns, doors, services and nearby equipment. Include usable height and the space required for the handling equipment and its load. If the project involves a narrow-aisle arrangement, identify the truck and guide requirements early.

Explain whether access is needed from one or both sides and whether covered outdoor storage is part of the project. Avoid describing those requirements as optional details after the main rack has already been selected.

Material dimensions and load information support a useful enquiry.
Material dimensions and load information support a useful enquiry.

Use a complete enquiry checklist

Include Detail
Load schedule Dimensions, weights and supported material
Storage target Positions, levels and stock separation
Site drawing Footprint, heights, obstructions and access
Handling method Equipment, approach and load envelope
Environment Indoor, outdoor or covered outdoor
Installation scope Supporting surface, access and project responsibilities

Attach photographs to clarify the drawing. Where floor or foundation information is unavailable, identify that gap so the project team can resolve it rather than silently assuming a standard condition.

Review the proposal before release

Check arm lengths, column configuration, support spacing, accessories and capacities against the original schedule. Cogan's product information directs buyers to the quote and approval drawings for detailed arm and column capacity specifications. Confirm that any revisions appear in the final project documents.

Compare cost on the full scope, including delivery and installation responsibilities. Do not assume a universal price per bay because bay dimensions, load requirements and accessories vary. Keep a record of the approved arrangement for loading, maintenance and future changes.

The enquiry should identify environment and installation scope.
The enquiry should identify environment and installation scope.

Questions buyers ask

What is the minimum information for an initial enquiry?

Start with material dimensions and weights, the available area and the handling method. Photographs help the supplier identify additional questions.

Should I choose LD or HD columns myself?

Cogan states that its engineer determines column type from the arm quantity and maximum load requirements. Supply the load information rather than assuming a column designation.

Can the layout change after approval?

Have changes reviewed and documented before ordering or installation proceeds on a revised basis.

Product references and next step

Consult Cogan structural cantilever racking and the cantilever guide. Submit the checklist through Request a Quote.