How to

Teach. Learn. Build.

Cogan Blog

Insights, guides, and industry trends on mezzanines, industrial storage, and warehouse optimization.

Articles are compiled from publicly available industry sources for informational purposes only. Images are illustrative and actual products may vary.

Mezzanine Stairs: Plan the Landings and Daily Access Before the Footprint
Mezzanines

Mezzanine Stairs: Plan the Landings and Daily Access Before the Footprint

Plan mezzanine stairs as a complete access route, including the floor approach, stair flights, landings and the space where people arrive upstairs. The smallest staircase footprint is not always the most useful arrangement. Start with the platform's use, finished floor levels and expected movement, then have the project team select the appropriate stair configuration.

4 min read
Bicycle Storage in Tenant Lockers: Check the Bike, Door and Route Together
Lockers

Bicycle Storage in Tenant Lockers: Check the Bike, Door and Route Together

A bicycle fits a tenant locker only when it can travel through the building, turn through the doorway and stand inside without obstructing the door or shared aisle. Compare the actual bicycle and accessories with the complete route. Internal floor area alone can overstate how usable a compartment will be.

4 min read
Warehouse Safety Gates: Plan Pedestrian Crossings and Swing Clearance
Guardrails

Warehouse Safety Gates: Plan Pedestrian Crossings and Swing Clearance

A warehouse pedestrian safety gate should connect a planned walking route to a deliberate crossing point. Check the opening, full swing path, mounting arrangement and visibility to approaching traffic before selecting the gate. A self-closing mechanism helps return the gate to its closed position; it does not establish vehicle-impact protection or decide when a person can cross.

4 min read
Cantilever Rack Bracing: What to Check Before Changing a Row
Cantilever Racking

Cantilever Rack Bracing: What to Check Before Changing a Row

Cantilever rack bracing is part of the structural system and must be reviewed before a row is extended, shortened or altered. Do not remove a diagonal to create access or assume that adding columns repeats the existing design automatically. Start with the original drawings and have the proposed configuration assessed as a complete row.

4 min read
Tool Crib Inventory: Build a Clear Checkout, Return and Repair Process
Partitions

Tool Crib Inventory: Build a Clear Checkout, Return and Repair Process

A useful tool crib combines a physical access boundary with a clear record of where tools are, who has them and whether they are ready for use. Define checkout, return and repair handling before adding more shelves. A locked enclosure controls entry, but it does not by itself keep an accurate inventory.

5 min read
Floor Angle Guides: Where Low-Level Rack Protection Fits
Rack Protection

Floor Angle Guides: Where Low-Level Rack Protection Fits

Floor angle guides create a low boundary along a rack or other protected area. They are useful to evaluate where the exposure is close to the floor and a continuous run is appropriate. Compare their coverage, mounting and operating clearances with individual rack post protectors and end guards before specifying a layout.

4 min read
Mezzanine Flooring: Compare Decking for Carts, Storage and Work Areas
Mezzanines

Mezzanine Flooring: Compare Decking for Carts, Storage and Work Areas

Mezzanine flooring should be selected as a complete deck assembly for the way the platform will be used. Compare the walking surface, support spacing, wheel loads, cleaning conditions and work below the platform before choosing a material. A floor that suits hand-carried cartons may need a different specification when small-wheel carts, shelving legs or equipment introduce concentrated loads.

5 min read
Tenant Storage Locker Turnover: A Checklist for Property Managers
Lockers

Tenant Storage Locker Turnover: A Checklist for Property Managers

Tenant storage locker turnover works best as a documented handover: confirm the correct compartment and authority to access it, record its condition, complete any approved maintenance, and update the assignment before releasing it to the next resident. An apparently empty locker is not enough to establish that reassignment is ready.

5 min read
Warehouse Guardrails After an Impact: Document, Assess and Restore
Guardrails

Warehouse Guardrails After an Impact: Document, Assess and Restore

After a warehouse guardrail is struck, control the affected area, document the contact and have the complete installation assessed before restoring normal operation. A straight-looking rail does not establish that its posts, connections, anchors or supporting concrete are unchanged. The response should follow the site's incident procedure and the manufacturer's instructions for the installed system.

5 min read
1 2 3 4 5 6 7 8 Next »